Head Marala
Sialkot
Punjab
The original headworks near Marala along with the Upper Chenab Canal were built as part of the Triple Canals Project of British India during 1906–1912. The canal was meant to irrigate an area of 648,000 acres in the Gujranwala District as well as to transfer waters to the Ravi River near Balloki. It was opened in 1912 and fully completed by 1917 at a cost Rs. 37 million. It became profitable in 1938–39. The waters transferred to the Ravi River were further fed to the Lower Bari Doab Canal via the Balloki Headworks, irrigating the Montgomery and Multan districts. This canal became profitable at least a decade earlier than the Upper Chenab Canal. The waters of the Ravi River itself were left to irrigate the semi-arid states of Bikaner and Bahawalpur.