Availability
Available rooms from Thu, 28-Mar-2024 to Fri, 29-Mar-2024.
Available rooms from Thu, 28-Mar-2024 to Fri, 29-Mar-2024.
The Pearl Continental hotel is located in Muzaffarabad. Elegant rooms include contemporary decor, earth-toned hues, and soft lighting. Each apartment is furnished with a sofa seating space, a flat-screen television, and a minibar. There is a shower and toiletries in the private bathroom. The River Junction is 2 km from the Muzaffarabad Pearl Continental Hotel, and Neelam Fort is 3 km away. The park is 5 km away, and Pir Chinasi is 30 km away. Guests can play billiards or table tennis, go hiking,
Guests can play a game of billiards, table tennis, or go on a hiking trip. Staff at the tour desk can assist with car rental and sightseeing arrangements. The restaurant serves a spread of continental and Pakistani specialties. In-room dining is also possible with room service.
From 2:00 pm
Untill 12:00 pm
Cancellation and prepayment policies vary according to room type. Please check the room conditions when selecting your room.
Children of any age are welcome here
Bank Transfers & Online Payment options available in the following bank account.
Based on 782 reviews
Guest reviews are written by our customers after their stay at Hotel Pearl Continental Muzaffarabad
goslag
wg4n29
Dhani Waterfall also known as Dhani Noseri Waterfall is located in Neelum Valley, Muzaffarabad District of Azad Kashmir in Pakistan.
Dhani Waterfall also known as Dhani Noseri Waterfall is located in Neelum Valley, Muzaffarabad District of Azad Kashmir in Pakistan. It is 38 kilometres from Muzaffarabad District. It is the highest waterfall in Neelum Valley.
The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power project in Azad Kashmir designed to divert water from the Neelum River to a power station on the Jhelum River.
The Neelum–Jhelum Hydropower Plant is part of a run-of-the-river hydroelectric power project in Azad Kashmir (AJK) designed to divert water from the Neelum River to a power station on the Jhelum River. The power station is located 42 km (26 mi) south of Muzaffarabad, and has an installed capacity of 969 MW. Construction on the project began in 2008 after a Chinese consortium was awarded the construction contract in July 2007. After many years of delays, the first generator was commissioned in April 2018 and the entire project was completed in August 2018 when the fourth and last unit was synchronized with the national grid on 13 August and attained its maximum generation capacity of 969 MW on 14 August 2018.
Neelum is a district of Pakistan-administered Azad Kashmir in the disputed Kashmir region. It is the northernmost of 10 districts located within the Pakistani-administered territory of Azad Kashmir.